Wednesday, May 14, 2014

Final Floor Plans





These are my final floor plans. I color coded the space that are private as red and public as blue. I also put dashed lines to indicate how the circulation takes place and numbered all the spaces to make the floor plans easy to read.

Thursday, May 8, 2014

Another Landscape Attempt

The pathways created aren't random. They're derived from the orientation of the rooms and ribs of the buildings. The wider have more importance because they lead to the major space on this site. I also used the space around the site to make green spaces and left a 20' pathway for bikers or pedestrians to walk on.

Tuesday, May 6, 2014

Landscape attempt

This site plan view shows how the landscaping of this site is very inviting. The green  color indicate where grass would be and the blue indicates where there might be a small pond and last but not least the dark grey are pathways through which my guest can get to either their rooms, out door movie theater and gym.

Monday, May 5, 2014

Floor Plan Update

I have changed how the vertical circulation take places. The auditorium is touch the front of the building instead of the back. The fluency of the circulation to the conference is also very clear because the walls draw you straight into the very end of the building.

Massing update

The massing of my media complex has change a little due to corruption of my flash drive. The ribs of the building act a little different then the previous massing. One of the ribs act differently because it turns into a accommodation space for my guest and it is very convenient for my guest to circulate to this building from their irrespective rooms. Last but not least the round curved space in the media complex acts as an auditorium taking its true shape and having a core that runs vertically up this space.

Monday, March 31, 2014

MORE PROGRESS COMPUTER MODEL


This is a another progress model. There is still struggle on how to incorporate the cubes and the building in the same language. i kinda gave it a shot on letting both of the elements flow freely using each other. The cubes are all of different size and each of them either let the rib pierce through it or doesn't, where its does pierce there is a void cut to indicate that.

Thursday, March 27, 2014

MORE PROGRESS!


This is a different attempt on how i integrate my building with the site and how the ribs of the building make little space for people to walk under/around and a part of the building is stretched out and folded many times to become seating and a outdoor movie theater. Since i wanted to stay true to the neighborhood i decided to shape the hotel as a box like all the other neighboring building around Red Hook Brooklyn.

Tuesday, March 25, 2014

PROGRESS MODEL

 This is a rendering showing how one would see the entrance of the building from bread street. The intention of this rendering is to attract and invite people to come see what this building is.


 I attempted to make a landscape in which my hotel rooms are wedged in. They are somewhat exposed to get natural light. the landscape also has pathways through my guest will get to their rooms.
This is a top view of my site and the red dashed lines show the circulation through the building and to the hotel rooms. The are still some aspects i still have to consider, the building still needs improvement.

The red color shows what i have added to my building and the reason for me adding the piece on the top is to give my audience a direction of which way to go. Towards the bottom i have put a outdoor screen where people can sit on the landscape at anytime and enjoy a movie.